
Design Build Project:
Owner: Tri-County Metropolitan District of Oregon
Location: Tilikum Crossing Bridge over the Willamette River in Portland, Oregon
Bridge Design: 1,720 ft. span Cable Stayed Bridge with 2 180 ft. tall towers.
General Contractor: Kiewit Construction
Consulting Engineer: T. Y. Lin